Some notable projects for 2024, Quarter 1:
- Carried out Acoustic Emission Testing Inspection Services for tanks in Indonesia
- Performed Pulse Eddy Current (PEC) inspection for Pipelines Inspection in Indonesia
- Accomplished AUT Inspection on Pipeline in UAE
- Executed Phased Array Ultrasonic Testing (PAUT) on Pressure Vessels (Weld Joints) in UAE
- Won contract for Magnetic Flux Leakage (MFL) Tank Floor Inspection in Egypt
- Conducted Acoustic Pulse Reflectometry (APR) inspection of Heat Exchanger U-Tubes in Pakistan
- Completed IRIS Inspection Services of Boiler Tubes in UAE
- Implemented Phased Array Ultrasonic Testing (PAUT) for tie rod inspection in Qatar
- Secured contract for Alternating Current Field Measurement (ACFM) inspection of rotary bushing and cable drum in UAE
- Landed contract for ECT Inspection of Heat Exchanger Tubes in Egypt
- Carried out Acoustic Pulse Reflectometry (APR) inspection of heat exchanger tubes in Malaysia