Some notable projects for 2024, Quarter 1:

  • Carried out Acoustic Emission Testing Inspection Services for tanks in Indonesia

  • Performed Pulse Eddy Current (PEC) inspection for Pipelines Inspection in Indonesia

  • Accomplished AUT Inspection on Pipeline in UAE

  • Executed Phased Array Ultrasonic Testing (PAUT) on Pressure Vessels (Weld Joints) in UAE

  • Won contract for Magnetic Flux Leakage (MFL) Tank Floor Inspection in Egypt

  • Conducted Acoustic Pulse Reflectometry (APR) inspection of Heat Exchanger U-Tubes in Pakistan

  • Completed IRIS Inspection Services of Boiler Tubes in UAE

  • Implemented Phased Array Ultrasonic Testing (PAUT) for tie rod inspection in Qatar

  • Secured contract for Alternating Current Field Measurement (ACFM) inspection of rotary bushing and cable drum in UAE

  • Landed contract for ECT Inspection of Heat Exchanger Tubes in Egypt

  • Carried out Acoustic Pulse Reflectometry (APR) inspection of heat exchanger tubes in Malaysia